www.3700.COm威尼斯

Photovoltaic Engineering Photovoltaic Engineering
240KW Photovoltaic Project in Shenglongte Industrial Park, Dongguan, Guangdong

The project adopts polycrystalline silicon photovoltaic modules, with a total installed capacity of 240KWp, an average annual sunshine time of 3.55 hours, and an average annual power generation of 311,000 kWh.

1.png

【网站地图】【sitemap】